in Anyang Republic of Korea sales price shop near me near me shop factory supplier High Speed Braiding Machine 6 manufacturer best Cost Custom Cheap wholesaler

  in Anyang Republic of Korea  sales   price   shop   near me   near me shop   factory   supplier High Speed Braiding Machine 6 manufacturer   best   Cost   Custom   Cheap   wholesaler

Our AdvantagesProducts Huge volume in Inventory, No MOQ necessary We comply with all the global requirements, these kinds of as ISO9001 and TS16949 specifications. Our products are manufactured by modern day computerized equipment and tools. we have received the trust of consumers globally.

The EPT motor of PGF hello-velocity knitting EPTT is used with the strategy of frequency conversion, which makes it possible for the stepless velocity management even throughout the operation, for case in point: whilst the feeding breaks (finishes), the EPTT is routinely stopped even though the car feeding unit is utilised for knitting core fabirc, for equally thick or thin main material inside of the restrict, the shipping is uniform the EPTT is also stopped immediately whilst main breaking(ending) to avoid degrated product. And the braided cloth that is created with PGF hello-pace knitting EPTT is of larger qualify and more reliable.

II, Functions AND Material OF KNITTING
PGF hi-pace knitting EPTT is capable to knit curtain belt, shoe belt, cummerbund of the styles of column, pipe, and flat, and pipe-shape jacket, and so on.
A variety of varieties of substance are adoptable for PGF hello-pace knitting EPTT, this sort of as cotton yarn, chemical fibre yarn, silk, delicate metallic wire, and so on.

III, Features
PGF hello-speed knitting EPTT is of the shut structure, convenient for procedure, very automatic, rapid for adjustment, dependable for procedure, of reduced noise, of increased effectiveness, of EPT high quality and so on.

IV, Procedure Approaches
Before commencing the EPTT, shall verify the subsequent things:
1 regardless of whether the EPTT strain is right
two regardless of whether the earth device is reliable
three whether or not the motor steering is right
4 clear up the desk, and other obstructions that influence the procedure of the EPTT
five whether the EPTT oil is competent (oil product, oil quantity)
When the over objects are checked and passed, comply with up the under processes to begin the EPTT:
one link the EPTT (EPTT two phase 380v)
two go the change of EPT box to the position of quotON quot(the EPTT source indicator is on, which means it is EPTTed)
three press the start button
four flip the rotating-setup button clockwise
five refer to the manual of frequency conversion EPTT to procedure the EPTT.

V, Treatment method FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) whilst the EPTT is doing work, the breaking indicator is on. Check every single yarn cop. If the yarn is broken, pull the finish of that yarn in direction of the finished knitting, and then push the startup button if the yarn cop is vacant, just take off that one particular, and exchange it and thread the yarn and pull the finish of yarn in the direction of the completed knitting, and then push the startup button. If the core is damaged, examine the core unEPTTthe EPTT body, and pull the finish of the core toward the concluded one, and then press the button to knit.

VI, ADJUSTMENT OF Certain Speed
To change the velocity of the best remaining EPT on the cEPTTr column can receive distinct speed of certain, and different sheer-condition cross factors of each and every length in mm (or named as item density, product no.)

Refer to the below chart and table 1 for particulars

DIAGRAM OF Equipment

Contrast desk in between the certain velocity of hello-speed knitting EPTT and EPT EPTTble one
(from the still left to the proper)
Frequency of motor: 60HzZB=30ZC=28
ZA speed of bound CM/min number of sheer-condition cross level/CM

Frequency of motor: 60HzZB=30ZC=36
ZA velocity of sure CM/min variety of sheer-form cross stage/CM

Frequency of motor: 60HzZB=30ZC=38
ZA speed of sure CM/min number of sheer-form cross stage/CM

Notice: Whilst the frequency of motor is not 60HZ, the velocity of certain is that the price in the above table occasions the genuine operate frequency/sixty, and the sheer-condition cross position is not changed.

VII, Routine maintenance INTRODUCTION
For the EPTT that is getting used, have to lubricate its direct, spline ingot groove, and the lubrication volume can not spill over, and it is ideal to lubricate it just keeping away from dry-managing. Must add oil on the concave ring of spline shaft, at lEPT two moments per eigEPTT several hours, many drops for every time.
The oil that is mostly utilised on the spline EPT box have to be changed fully right after 1 thirty day period, and then, is to be supplemEPTTd in accordance to oil scale amount. Throughout the production, decide no matter whether to exchange lubrication (the lubrication utilised on the EPTT is 32#) in accordance to the oil position. Shall thoroughly clean up the float on any areas usually (do not do it while the EPTT is running).

VIII, Safety measures for Set up and Assembly amp Unassembled
Installation: have to set the EPTT on the rigid floor, and should keep it in stage following although putting in the rear desk board.
Hanging Installation: if this EPTT is moved right after dis-packaged, no matter whether for forklift or crane, the position of toughness shall alwaEPTTbe established on the reduce crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, should not on the desk board of the knitting EPTT.

EPTTAL Part

Hello-speed sealing knitting EPTT Procedure guide Total eleven internet pages
Website page six
seven.2 standard faults and resolution methods for frequency conversion EPTT in under desk

Fault screen Fault material amp description Treatment method techniques
E.O.C.A Overcurrent in acceleration one, check whether or not the motor is shorted or partly shorted
two, extend the acceleration time
three, the configurations of frequency conversion EPTT is not rational, and EPT the ability of the frequency conversion EPTT
4, minimize the torque to enhance the rated price.
E.OC.n Overcurrent in continual pace one, examine no matter whether the motor is shorted, regardless of whether the output wire is insulated effectively
2, verify whether or not the motor is stopped to run, regardless of whether the mechanical load waves
3, check whether or not the capability of the frequency conversion EPTT is also modest, and EPT the ability of the frequency conversion EPTT
four, check out no matter whether .the voltage of the EPTT community waves.
E.OC.d

E.OC.S

Overcurrent in deceleration
Overcurrent in halting
1 verify whether or not the wire insulation is effectively, whether the motor is shorted
2 EPT the deceleration time
three change by a frequency conversion EPTT of more substantial capability
four the braking capability of direct recent is way too large, and reduce the braking capacity of immediate recent
five for the EPTT fault, send again to the factory for restore.
E.GF.S
E. GF.a
E. GF.n
E. GF.d
Shortcut to floor one examine no matter whether the wire of motor is shorted
2 increase the EPTT community, and verify whether or not there is the wave of voltage
three ship again for fix
E.ou.S

E.OU.a

E.OU.n

E.OU.d

Overcurrent in acceleration
Overcurrent in deceleration
Overcurrent in continual pace
Overcurrent in deceleration
one extend the deceleration time, or insert with the brake resistor
two improve the EPTT network, and verify no matter whether there is the wave of voltage.
E.Fb.S
E. Fb.a
E. Fb.n
E. Fb.d
Fuse melted

If fuse melted, send out back for restore
E.Lu.s
E. Lu.A
E. Lu.n
E. Lu.d
Minimal voltage 1 examine whether the voltage is normal
2 examine whether or not the load waves
3 check out whether or not the section is lacked.
E.OH.S
E. OH.A
E. OH.n
E. OH.d
Overheat of frequency
conversion EPTT
1 examine regardless of whether the fan is stopped to run, whether or not the radiating piece is protected by imEPT
2 check out whether or not the setting temperature is normal
3 examine whether the airing room is ample, whether or not the air is convective
E. OL.A
E. OL.n
E. OL.d
Overload of frequency
conversion EPTT
150% for every minute
1 check no matter whether the frequency conversion EPTT is of smaller sized capacity, no matter whether is protected by imEPT
2 check out no matter whether the load of the EPTT is blocked
three V/F curve is not established nicely, and shall be reset.

Hello-velocity sealing knitting EPTT Operation guide Complete 11 web pages
Website page 7
continued

E.OA.A
E.OA.n
E.OA.d
EPT overload one hundred fifty% per one particular moment one examine no matter whether the mechanical load moves
two the motor distribution is as well small
3 the motor is overheated, and the insulation turns into worse
four check no matter whether the voltage moves tremendously
five verify no matter whether the stage is lacked
6 the mechanical load is EPTd.
E.OT.A
E.OT.n
E.OT.d
Above-torque of motor one check no matter whether the mechanical load moves
two check out whether or not the motor configuration is too tiny.
E.bs.A
E. bs.n
E. bs.d
E. bs.s
The electromagnetic contactor assistant coil does not feedback. Send again for restore
E.bT.A
E. bT.n
E. bT.d
The brake transistor is damaged. Get in touch with with the manufacturing facility.
E.EC.S
E. EC.n
E. EC.d
E.EC.A
CPU fault Get in touch with with the manufacturing facility.
E.EE.S
E. EE.n
E. EE.d
E.EE.A
E Promenade fault Make contact with with the factory.
ER Exterior interference Insulation with the interference useful resource
ES Unexpected emergency parking UnEPTTthe unexpected emergency standing
20 four-20mA damaged circuit EPT with the over broken one
Pr Error of specification setup Appropriate specification of setup
DCb Brake position of immediate present UnEPTTthe brake standing of direct existing

Hi-velocity sealing knitting EPTT Procedure manual Whole 11 pages
Website page 8
VIII, Key perform, perform display, operation introduction of HLPC 0D7523A EPTT procedure EPTT
8.1 essential perform of HLPC 0D7523A EPTT operation EPTT

1 PROG programming/purpose display important
2 EPTTR/DISP important of details confirmation, following the data is amended, press this important to confirm the entry of information
three up/down keys, select specification, amend details and so on.
4 Run demand from customers key of operation, start procedure
5 Quit/RESET stop/ reset key, stop procedure, and the operation is disturbed, and reset
six FREQ Established frequency setup button, can established up this button in orEPTTto input the primary frequency.

Hello-pace sealing knitting EPTT Procedure guide Overall 11 pages
Webpage 9
eight.two Rationalization of operate exhibit objects

  1. T 50. frequency rate 50. HZ
  2. F 50. rated frequency fifty. HZ
  3. R 02. output of existing 2.0A
  4. U220 output of voltage 220V
  5. U540 direct voltage 540V
  6. r 39. temperature 39 ordmC
  7. .001 counter
  8. L50. PID opinions is fifty%
  9. 000. running speed
  10. Fo r constructive running
  11. r EU unfavorable operating

Hi-pace sealing knitting EPTT Operation handbook Whole 11 pages
Web page 10
8.3 Rationalization of keyboard

EPTT on #8594 screen F00.(push PROG) #8594display FOR or REV (press PROG) #8594 present C000 (the function code choice interface can make use of #9661 #9651keEPTTto adjust the flash digit variety, the very last digit flashes) #8594 (press EPTTR) current C000 (The first digit flashes) #8594 (press EPTTR) current C000 (The first digit flashes) #8594 (push EPTTR) existing C000, the very last digit flashes.

Case in point: c111 is established as two, as adhering to
EPTT on #8594 screen F00. #8594 FOR #8594C000 (the final digit flashes) #8594C001 (the very last digit is changed into one, and flashes) press EPTTR #8594C001 (The center digit flashes) push #9651 #8594C011 (the center digit is modified into 1, and flashes) press EPTTR #8594C011 (The 1st digit flashes) press #9651 #8594C111 (the very first digit is altered into 1, and flashes) push EPTTR EPTT #8594present (push #9651) #8594present two (existing EPTTr EPTT, and it is alright) #8594C112

Hello-speed sealing knitting EPTT Operation manual Overall 11 internet pages
Webpage 11
VIII, EPT Diagram (see attachment)

VV, Thorough EXPLAINATION OF FREQUENCY CONVERSION EPTT

I. EPTT Introduction
The higher-velocity braiding EPTT employs a type of EPTT and novel style. Four 16-spindle braiding EPTTs are built-in into one unity. By using the VFD-A variety alternating existing motor EPTr that is developed via combining the computer manage EPT, the centralized frequency-modify and stepless velocity regulation can be understood. The EPTT is presented with many varieties of automatic protecting functions this kind of as: computerized cease even though the line breaks, more than torque, over voltage, unEPTTvoltage, overheating, more than load and so on. The EPTT also has different outstXiHu (West EPT) Dis.Hu (West EPT) Dis. positive aspects, for instance: high rotate speed, higher production performance, modest floor area, lower sound, EPTT services lifestyle and straightforward operation as nicely as strength saving. It is the upgrading and new generation product of classic disc braiding EPTT.
II. Fundamental EPTnical Parameters
Rated EPTT of motor: 075W
Rated velocity of motor: 1390r/min
Variety of spindle: sixteen*four 960*790*700(L*B*H)
24*two 1240*620*seven hundred(L*B*H)
Specification of quill:( Phi48*one hundred sixty)mm
Spindle pace: 350r/min
Method of pace adjustment: frequency-modify and stepless velocity regulation
III. Service Problems
Voltage of EPTT source: AC220V plusmn10%HUO or AC380V plusmn10%
Frequency of EPTT provide: 50HZ plusmn5%
Ambient temperature: -10 ordmC-40 ordmC(no condensation and no freeze)
Ambient humidity: unEPTT90%RH(no condensation)
Operating environment: no h2o droplets, steam, dust and grease stain
no putridity, flammable fuel and liquid
no drifting dust and steel particle
solid foundation, no critical vibration
no interruption of electromagnetic sounds.
IV. Set up
four.1The gear fixture foundation are not required for the installation of this EPTT. Only area the EPTT on the solid and even concrete ground and preserve stage without having vibration.
four.2 Configuration of EPTT EPT
four.two.1 According to the buyer need, the EPTT could supply substantial pace braiding EPTTs that are used to two types of voltage ranges: 220V, 50HZ and 380V, 50HZ. The consumer shall link lines correctly according to the appropriate voltage stage of purchased equipment. Be certain no wrong relationship so as to steer clear of that the EPTT cannot work usually or any injury happens.
four.2.two When user disposes the EPTT source of large velocity braiding EPTT, remember to EPTTly care regardless of whether there is a dependable floor line in the electrical energy grid (SV220VAC380V)technique (i.e. Whether or not there is reputable grounding for socket grounded phase of EPTT source AC220V or AV380V). If not, an extra protecting ground line for the EPTT must be manufactured. Its base resistance shall not be above 4 Omega. And then merge it into the grounded phase of EPTT socket (SV220V or AC380V) or inducted to the grounding conclude of the EPTT right.

four.2.three The EPTT line link of the EPTT is currently done for end users. The grounded stage of EPTT supply plug is rightly related with grounding conclude of the EPTT. The consumer just wants to insert the EPTT supply plug into the EPTT offer socket that is prepared according to related voltage level to join the present.
4.3 In the situation of not connecting the current, open up the door of EPT management box with the provided crucial to check out whether or not electric components in EPT control box are damaged or loosening. If the connecting line is loosening, appropriate measures must be accomplished in time.
5.1 No-load Examination
five.1.one Swap on the EPTT source of EPT manage box
five.one.2 Change on the switch of EPTT source inside of the EPT handle box. If the indicating lamp of EPTT offer on the management panel and pertinent indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that almost everything is rigEPTT and no-load test can be operated.
five.1.3 Flip the speed-regulating potentiometer of frequency placing knob on the EPT handle box panel back to the scale 50(anti-clockwise rotation). Instantaneously push the button to make the EPTT to rotate instantaneously and observe no matter whether it is rotating clockwise or not. If not, exchange the positions of U and V of output port of frequency changer. View and ensure that the all working is fleXiHu (West EPT) Dis.ble and sleek to ensure no obstructions and irregular clash. If one thing incorrect transpires, pertinent reasons ought to be found in orEPTTto remedy the issue.
5.one.four Press the startup button on management panel, then slowly increase the managing force of alternating motor EPTr (i.e. slowly rotate the potentiometer knob clockwise) at the same time, look at and make certain that the speeds of motor and rotation board are rising steadily and that the running is typical.
5.one.five Press the cease button on control panel and watch regardless of whether the motor is synchronized with the instruction. If not, the cause shall be identified in orEPTTto eradicate the fault.
5.2 Load Take a look at
five.two.one After no-load check is finished, the load test can be operated. Location the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the required specified quill with the necessary shade yarn in accordance to the fancy yarns that will be weaved and get everything ready.
five.two.2 Swap the velocity-regulating potentiometer knob on the EPT handle box panel back again to the scale , instantaneously press the button to flip on motor and make it rotate. Watch that the operating of quill has impediment or clash. If some thing wrong takes place, the reason shall be found in orEPTTto get rid of the fault.
5.2.3 Push the startup button and turn the speed-regulating potentiometer knob. Make the motor to hold operating for a whilst(five~10min)in the speed of 1000r/min. If almost everything is proper, cut off a single yarn by guide. If the motor is turned off at once, it is proved that computerized end protective device is delicate. So, the EPTT test is concluded completely. The EPTT can be place into the standard manufacturing.
VI. Particular Notices
In orEPTTto make certain the securities of folks and products and receive the ideal provider result, we would like to especially rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of consumers that pursuing situations need to be paid a lot more attentions while setting up this EPTT.

6.one The workshop with the set up of this EPTT should have good ground wire with ground resistance of considerably less than 4

6.two This EPTT should be grounded independently it shall not be jointly grounded with substantial electric powered-recent EPTTs, these kinds of as electric powered welding EPTT and substantial-EPTT electric motor. The EPTal area of ground line must be equal or far more than 4mmtwo.
six.3 Before this EPTT is remaining from the manufacturing manufacturing facility, for 108 parameters of frequency changer, following 18 parameters (see table one) want to reset in accordance to demands of the EPTT technological functionality, and the other a hundred thirty parameters are all kept as what they are set at production manufacturing facility. If there is no EPTT need, buyers you should do not randomly change frequency changer parameters any far more.

Purpose code Purpose Setting scope and function rationalization Established price
C001 Accelerating time placing .1~6500S four
C006 Intermediate voltage location .1~255/510 13
C007 Intermediate frequency environment .01~600 two.five
C571 Max. frequency placing 50.~600. fifty
C012 Working handle placing ~two 1
C013 Running frequency alternative ~two one
C015 Stopping way alternative ~1 one
C016 Reverse turning option ~one 1
C571 Startup frequency environment .one~10 5
C571 Inching frequency placing ~600 twenty
C033 Accelerating time placing .1~6500S 3
C050 Multi-functional input stop FOR 1
C051 Multi-functional enter finish REV 4
C053 Multi-functional enter stop SPH seven
C075 Analog amount EPT location .~600 50
C088 EPT rated rotate speed ~9999 270
C100 EPTT torque payment .~10. 5

6.4 When frequency changer outputting, in output facet main circuit, alternating current getting in touch with place is not allowed delivering and breaking EPTT source.
six.five When the temperature in workshop surpasses 40 ordmC, compelled air cooling measure should be adopted to EPT handle box.
six.six When above torque or other faults come about, just before the purpose is clear and faults are solved, frequency changer can not be began again in orEPTTto steer clear of bringing injury to the EPTT. The approach of restarting frequency changer is: 1. To start with press the RESET button on frequency changer EPTT operator panel and then press the end button on main managing EPT box operation panel and last but not least press the startup button two. Change off the EPTT supply in major controlling EPT box and swap on again, and then push the startup button.
six.seven When the swap of EPTT source in EPT handle box is turned off and just before indicating lamp on frequency changer EPTT operator panel goes out, any part of circuit inside EPT manage box are not able to be touched or any assembly and disassembly and wiring can’t be accomplished.
six.8 After braiding spindle is installed in the quill, reverse turning is not allowed any a lot more in this EPTT.
six.9 Max. working rotate speed of this EPTT is created as 350r/min, but actually inexpensive rotate velocity is all around 300r/min. Prior to this EPTT leaves production manufacturing unit, its max. operating rotate velocity is established to be limited inside economical rotate velocity scope. Clients remember to do not randomly adjust corresponding parameters any more to boost the speed. In this way, EPTT accident can be prevented.
six.10 This EPTT cannot run EPTT time (considerably less than 30min) at reduced velocity of significantly less than 100r/min, in any other case electrical motor will be ruined due to overheating.
six.11 It is unfavorable for this EPTT to be started and stopped at lower or large rotate speed (when the EPTT is started out, if rotate velocity is too minimal, starting up torque is lower and this EPTT is hard to be commenced up but if rotate speed is way too substantial, starting up existing is way too substantial and frequency changer is very easily overloaded. When the EPTT is stopped, if rotate pace is too higher, frequency changer is effortlessly to be in excess of voltage. When the EPTT is started up, remember to to begin with switch the knob of pace-regulating potentiometer on EPT handle box operation panel to the scale fifty (about 100r/min) and then push the startup button. When the EPTT is stopped, make sure you switch the knob of speed-regulating potentiometer back to the scale fifty and then press the end button.
six.twelve Stress-evidence check of spare elements within frequency changer is forbidden.
6.thirteen The key of EPT control box of this EPTT is held by its operator. And non-operator can’t work principal managing EPT box.
six.fourteen The electrical element of this EPTT must be taken care of and repaired by qualified and skilled EPT experts.
seven.Widespread faults and options
seven.1 Common faults and solutions of EPT management circuit can be witnessed in table 2.

EPT-speed Braiding EPTT Instruction Whole internet pages
No. Page
No. Fault Fault explanation and resolution
1 Switch on EPTT offer one.one Indicating lamp does not light-weight line stop looses or fuse breaks
2 Inching button two.one Electric motor can’t operate instantaneously
2.1.one Inadequate speak to of the button
2.1.2 Blunder of parameter setting
2.1.3 Fault of frequency changer
two.1.4 Poor make contact with of electric powered motor connection or fault of electrical motor
2.one.5 Obstructions at operating portion of the system
3 Press the startup button
4 Push the quit button
five EPTT end can not show up when the line breaks 5.1.one Fault or damage of electronic circuit
five.12 Mini-relay
five.1.3 Fault of EPTT transformer
5.1.4 Injury or poor get in touch with of line-break mini-relay

  in Anyang Republic of Korea  sales   price   shop   near me   near me shop   factory   supplier High Speed Braiding Machine 6 manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Anyang Republic of Korea  sales   price   shop   near me   near me shop   factory   supplier High Speed Braiding Machine 6 manufacturer   best   Cost   Custom   Cheap   wholesaler